Desalination
services.1.title
services.1.loc, 2023
- Challenge
- Industrial growth on the Yanbu coast was outpacing supply, and the existing plant ran at its limit through summer.
- Approach
- A two-pass reverse osmosis train with energy recovery, built in modules so capacity could come online in phases.
- Result
- 120,000 m³ a day delivered, with energy use per cubic metre cut by about a fifth against the previous plant.
120,000m³ of water per day